1. | Bauernhansl, J., Mandel, J., Diermann, S. (2012). Evaluating changeability corridors for sustainable business resilience. Procedia CIRP, vol. 3. |
2. | Beach, R., Muhlemann, A.P., Price, D.H.R., Paterson, A., Sharp, J.A. (2000). A review of manufacturing flexibility. European Journal of Operational Research, 1 (122). |
3. | Browne, J., Dubois, D., Rathmill, K., Sethi, S.P., Stecke, K.E. (1984). Classification of flexible manufacturing systems. The FMS Magazine, 2 (2). |
4. | Buzacott, J.A., Yao, D.D. (1986). Flexible manufacturing systems: a review of analytical models. Management Science, 7 (32). |
5. | Czerska, J. (2009). Doskonalenie strumiena wartości, Warszawa: Difin. |
6. | De Toni, A., Tonchia, S. (2005). Definitions and linkages between operational and strategic flexibilities. Omega. The International Journal of Management Science, 6 (33). |
7. | Dudek, M. (2016). Projektowanie szczupłych systemów wytwarzania. Warszawa: Difin. |
8. | Dudek, M., Kardela, J. (2014). Filar analizy kosztów w systemach produkcji klasy światowej. Zeszyty Naukowe Uniwersytetu Szczecińskiego, 804, Finanse, Rynki Finansowe, Ubezpieczenia. |
9. | Giachetti, R.E., Martinez, L.D., Sáenz, O.A., Chen, Ch-S. (2003). Analysis of the structural measures of flexibility and agility using a measurement theoretical framework. International Journal of Production Economics, 1 (86). |
10. | Gunasekaran, A., Yusuf, Y.Y. (2002). Agile manufacturing: a taxonomy of strategic and technological imperatives. International Journal of Production Resources, 6 (40). |
11. | Kasiewicz, S., (2009). Elastyczność przedsiębiorstwa w koncepcjach zarządzania zasobowego. W: S. Kasiewicz, J. rmińska, W. Rogowski, W. Urban (red.), Metody osiągania elastyczności przedsiębiorstw. Warszawa: Oficyna Wydawnicza SGH. |
12. | Koste, L.L., Malhotra, M.K. (1999). A theoretical framework for analyzing the dimensions of manufacturing flexibility. Journal of Operations Management, 1 (18). |
13. | Löffler, C., Westkämper, E., Unger, K. (2012). Changeablility in structure planning of automotive manufacturing. Procedia CIRP, vol. 3. |
14. | Marlok, E.K., Chang, D.J. (2004). Measuring capacity flexibility of a transportation system. Transportation Research Part A: Policy and Practice, 6 (38). |
15. | McFarlane, D. (1998). Modular distributed manufacturing systems and the implications for integrated control. London: Proceedings of IEE Colloquium on Choosing the Right Control Structure. |
16. | Milberg, J., Möller, N. (2008). Valuation of changeable production systems. Production Engineering Research and Development, 2 (4). |
17. | Niewiadomski, P. (2013). Praktyczny wymiar elastyczności produktowej zakładu wytwórczego. Zeszyty Naukowe Politechniki Poznańskiej, 59. |
18. | Schuh, G., Potente, T., Fuchs, S., Hausberg, C. (2012). Methodology for the assessment of changeability of production systems based on ERP data. Procedia CIRP, vol. 3. |
19. | Sethi, A.K., Sethi, S.P. (1990). Flexibility in manufacturing: a survey. International Journal of Flexible Manufacturing Systems, 2 (4). |
20. | Sushil, A. (2012). Enterprise flexibility. Global Journal of Flexible Systems Management, 2 (4). |
21. | Tolio, T., Terkaj, W., Valente, A. (2007). Focused flexibility and production system evolution. Toronto: Proceedings of the 2nd International Conference on Changeable, Agile, Reconfigurable and Virtual Production (CARV 2007). |
22. | Wiendahl, H.P., ElMaraghy, H.A., Nyhuis, P., Zäh, M.F., Wiendahl, H.H., Duffie, N., Brieke, M. (2007). Changeable manufacturing – classification, design and operation. CIRP Annals – Manufacturing Technology, 2 (56). |
23. | Wiendahl, H.P., Heger, C.L. (2004). Justifying changeability. A methodical approach to achieving cost effectiveness. Journal for Manufacturing Science and Production, 1–2 (6). |